On Trac Job

The link to the Carlsbad On Trac drawing are in the attached email. We need to determine how to calculate the exhaust in the warehouse space. I spoke with the designer at Salas O’Brien and she said to use Table 403.7. You can study M2.1 & M2.2 and get an idea of what we need to provide as far as calculations are concern. It looks like Carlsbad added four units to their warehouse space for a total of 111,000 CFM’s.

 

Please move quickly on this. We might need to add it to the next round of plan check. We need to know if we need to add more units on the roof and we need to know the cost.

$50,000

Category:
Location:
San Diego
Job bid date - 8/20/2022